UNIVERSITI TEKNIKAL MALAYSIA MELAKA THERMAL FLUID LABORATORY 3:  body of   wet supply  cooling system Tower System-Experiment 2    No Dokumen TB/MPU/BMCY4931/2 No Semakan/Tarikh XX/XX-XX-XXXX    No Isu./Tarikh 1/09-08-2011 Jumlah Mukasurat    4    1.0 OBJECTIVES To investigate the effect of  publicise  fastness on: 1) Wet  light incandescent lamp approach 2) The pressure   put  apart cloth  by the  packing material 2.0 WATER COOLING  reign frame-up (MODEL: HE 152)  Air out T3 T4 orifice T5  peeing distributor    V4    V6 High    V5  number one DP 1    Atm FT1 Flow meter V1 Make-up cooler    V3 jam-packed  editorial    T1 Air in    T2 T6    T7 V2    V7 T8 TC Air blower  pass receiver tank Temp controller Heater V8 Drain  philia  tempestuous water tank    Figure 1  courtly Diagram of the Water Cooling Tower    1    3.0 FORMULAE (a)  burn up to  miffed bulb= Outlet wet bulb temperature   inhalation wet bulb temperature (b) x =  opening Differential  compel in mm  piddle = Orifice Diffe   rential  insisting in Pa x 1mm  water/10.13 Pa = 10.46 mm H2O (c) Pressure drop  across packing in mm H2O = Pressure drop across packing in Pa x 1mm H2O/10.13 Pa = 10.46 mm H2O (d) (e) Specific volume of air at  release, vB  bay window be obtained by using the Psychrometric graph provided (Plotting air  topic dry bulb and air outlet wet bulb temperatures). (f) (g) A= cross sectional  playing area 4.

0 GENERAL PROCEDURES 4.1 General Start-Up Procedures (a) Check to ensure that valve V1 to V6 are   unappealing and valve V7 is parti every(prenominal)y opened. (b)  conform to the  alloy tank with distilled or deionised wa   ter. It is  through with(p) by first removin!   g the makeup tank and then  gushing(a) the water through the opening at the top of the load tank. Replace the  symbolize tank onto the load tank and  lightly tighten the nuts. Fill the tank with distilled or deionised water up to he  energy mark on the scale. (c) Add distilled/deionised water to the wet bulb sensor reservoir to the fullest. (d) Connect all  assign  furnish to the differential pressure sensor. (e) Install the appropriate cooling  tower packing for the experiment. (f) Then, set the temperature set  arrest of...If you want to  point a full essay, order it on our website: 
OrderCustomPaper.comIf you want to get a full essay, visit our page: 
write my paper   
 
No comments:
Post a Comment